Requirements at a glance
| Agency | Nevada State Contractors Board (NSCB); exams by PSI |
|---|---|
| Experience | 4 years as a journeyman, foreman, supervisor or contractor in the classification within the last 15 years (up to 3 years can be education) |
| Exams | 60 questions, 2 hours, 75%, plus the Construction Management Survey (business and law) |
| Books allowed | 2018 IBC |
| Fees | $95 per PSI exam ($140 for a trade exam plus the CMS), plus NSCB application and license fees and a bond |
Qualifying individuals for a Nevada C-15 Roofing and Siding license (roof coverings, waterproofing, siding and building insulation).
Official links
How to get licensed, step by step
Pick your classification
Find the NSCB classification that covers your work, and name the qualifying individual (an owner or a qualified employee) with 4 years of experience in it.
Apply to the NSCB
Submit the application with your experience verification, financial statement and fingerprints. The Board sends you an exam eligibility notice once it accepts your qualifications.
Schedule the CMS and C-15 trade exam with PSI
Book both exams with PSI. Bring the allowed references, tabbed. If you fail, wait 2 weeks; you get three attempts and must pass within 6 months of filing.
Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "C" classification bulletin and outlines (opens in a new tab)
Post your bond and get licensed
After you pass, the Board sets your monetary limit and bond amount ($1,000 to $500,000). File the bond and pay the license fee to receive your license.
How to prepare
- Bring the exact editions on PSI's outline. Nevada's trade exams use the 2017 NEC, the 2018 IBC/IRC and the 2018 UPC/UMC; a newer book gives some wrong answers.
- Tab your books with permanent tabs before exam day. Sticky notes are removed at check-in, and you can't write in the books.
- OSHA 1926 isn't allowed in the room, but every trade exam has a safety section from it. Learn the common numbers (fall protection at 6 ft, ladders 3 ft above the landing, trenches 5 ft).
- You need 45 of 60 (75%). Steep roofing (16) is the biggest section: tab IBC 1507 by roof covering type.
- Siding (8) and substrates (8) are next: know IBC Chapter 14 weather protection and roof deck requirements.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Building Code (IBC)Essential
The only book allowed in the room. Chapter 15 (roof assemblies) and Chapter 14 (exterior walls).
ICC store (opens in a new tab)Read free (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Not allowed in the room, but every Nevada trade exam has safety questions written from it: fall protection, scaffolds, ladders, excavations.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2018 (allowed in the exam room)
- 29 CFR Part 1926, OSHA Construction (not allowed in the room)
- NRCA Roofing Manuals (steep slope, metal panel and SPF, membrane); ASTM D4756 vinyl siding installation (not allowed in the room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Safety | 5 | |
| Roofing Substrates | 8 | |
| Steep Roofing | 16 | |
| Roofing Repairs | 4 | |
| Elastomeric Roofing | 7 | |
| Built-up Bituminous Roofing | 7 | |
| Sheet Metal and Flashing | 3 | |
| Siding | 8 | |
| Photovoltaic Systems | 2 |
Exam day details
- Administered by PSI Services for the Nevada State Contractors Board (NSCB).
- Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
- 60 questions in 2 hours; 45 correct (75%) to pass, higher than most Nevada trade exams.
- Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed.
- PSI may add up to 10 unscored trial questions, which count against your time.
- If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
- Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.
Frequently asked questions
What's on the Nevada C-15 roofing exam?
60 questions: steep roofing 16, roofing substrates 8, siding 8, elastomeric roofing 7, built-up bituminous roofing 7, safety 5, repairs 4, sheet metal and flashing 3 and photovoltaic systems 2.
What score do I need on the C-15 exam?
45 of 60 (75%), a higher bar than the 70% on most Nevada trade exams.
What book can I bring?
Only the 2018 IBC. Chapter 15 (roof assemblies) and Chapter 14 (exterior walls) cover the code questions; NRCA manuals and OSHA aren't allowed in the room.
Free questions with answers
Show all 10 free questions and answers
A hip roof measures 52 ft by 34 ft in plan, including overhangs, with a 5:12 slope (pitch factor 1.083). About how many squares of roof surface are there?
Answer: 19.15 squares
Plan area = 52 x 34 = 1,768 sq ft. The 5:12 pitch factor is sqrt(12^2 + 5^2)/12 = 13/12 = 1.083. Sloped area = 1,768 x 1.083 = 1,915 sq ft = 19.15 squares (1 square = 100 sq ft). 17.68 squares skips the pitch factor; 19.77 uses the 6:12 factor (1.118) by mistake. Every plane of a hip roof with the same slope uses the same factor.
Reference: General trade practice, Roof estimating: sloped area = plan area x pitch factor; 1 square = 100 sq ft
A cabin roof near Lake Tahoe has a 3-1/2:12 slope and will get 16-inch No. 2 naturally durable wood shingles. The slope length from eave to ridge is 14 ft. Using the maximum exposure in IBC Table 1507.8.7, about how many courses are needed (ignoring the doubled starter course)?
Answer: 48 courses
Table 1507.8.7: 16-inch No. 2 shingles on 3:12 to under 4:12 have a maximum exposure of 3.5 inches (4 inches applies at 4:12 and steeper). Slope length = 14 x 12 = 168 inches. 168 / 3.5 = 48 courses. Using the 4-inch exposure gives 42 courses, and the No. 1 value of 3.75 inches gives about 45; both exceed what the table allows for this shingle.
Reference: 2018 International Building Code, Section 1507.8.7 and Table 1507.8.7
Under IBC 1503.2.1, where metal is used for roof flashing, what minimum thickness is required?
Answer: 0.019 inch (No. 26 galvanized sheet)
1503.2.1 requires flashing at wall and roof intersections, at gutters, at changes in slope or direction and around roof openings; metal flashing must be corrosion resistant and at least 0.019 inch thick (No. 26 galvanized sheet). The same 0.019-inch minimum appears for shingle base and cap flashing in 1507.2.8.1.
Reference: 2018 International Building Code, Section 1503.2.1
Wood shingles will be installed in an area where the average daily temperature in January is 22 F. What deck does IBC 1507.8.1.1 require?
Answer: Solid sheathing
1507.8.1.1 requires solid sheathing where the average daily temperature in January is 25 F or less or where ice may form along the eaves. 22 F is below 25 F, so spaced boards are not allowed. In milder areas, 1x4 spaced sheathing on centers equal to the weather exposure is permitted (1507.8.1).
Reference: 2018 International Building Code, Section 1507.8.1.1
A crew finishes spraying polyurethane foam on a roof at 2:30 p.m. Tuesday. Under IBC 1507.14.3, during what window must the protective coating be applied?
Answer: Between 4:30 p.m. Tuesday and 2:30 p.m. Friday
1507.14.3 requires a liquid-applied protective coating (Table 1507.14.3) not less than 2 hours nor more than 72 hours after the foam is applied. 2:30 p.m. + 2 h = 4:30 p.m. Tuesday; 2:30 p.m. Tuesday + 72 h (3 days) = 2:30 p.m. Friday. A 24-hour limit is a common wrong guess.
Reference: 2018 International Building Code, Section 1507.14.3
A gravel-surfaced built-up roof is proposed outside a hurricane-prone region. Vasd is 110 mph and the site is Exposure B. Using IBC Table 1504.8, what is the maximum mean roof height for aggregate surfacing?
Answer: 30 ft
Table 1504.8 row Vasd 110 mph: Exposure B 30 ft, Exposure C NP, Exposure D NP. So aggregate surfacing is allowed up to a 30-ft mean roof height in Exposure B. 40 ft is the 105-mph value and 15 ft is the 120-mph value. "Not permitted" would be the answer in Exposure C or D.
Reference: 2018 International Building Code, Section 1504.8 and Table 1504.8
A house roof already has two layers of asphalt shingles. The owner asks for a third layer over them. What does IBC 1511.3.1.1 require?
Answer: A recover is not allowed; tear off down to the deck
1511.3.1.1 does not permit a roof recover where the existing roof has two or more applications of any type of roof covering. The roof must be replaced, and 1511.3 defines replacement as removing all existing layers down to the deck. A recover is also barred over water-soaked or deteriorated roofs and over slate, clay, cement or asbestos-cement tile.
Reference: 2018 International Building Code, Section 1511.3.1.1 and Section 1511.3
Rack-mounted PV panels will be installed on the roof of a Type VA building. Under IBC 1505.9 and 1510.7, what fire classification applies to the PV system?
Answer: Listed under UL 1703 and UL 2703, meeting Table 1505.1 (Class B for VA)
1510.7.1 points to 1505.9: rooftop rack-mounted PV systems must be tested, listed and identified with a fire classification under UL 1703 and UL 2703, and the classification must meet Table 1505.1 for the building type. Table 1505.1 requires Class B for Type VA. Panels must also be listed to UL 1703 and installed per the manufacturer (1510.7.2).
Reference: 2018 International Building Code, Section 1505.9 and Section 1510.7
A crew is applying modified bitumen on a 1/2:12 roof that is 46 ft wide and 20 ft above grade. Under 29 CFR 1926.501(b)(10), when may a safety monitoring system be used alone, without a warning line?
Answer: When the roof is 50 feet or less in width
1926.501(b)(10) allows guardrails, nets, PFAS, or a warning line combined with one of those or with a safety monitor on low-slope roofs. On roofs 50 ft or less in width, a safety monitoring system alone is permitted. This 46-ft-wide roof qualifies. 1926.502(h)(2) bars mechanical equipment where only a safety monitor is used.
Reference: 29 CFR Part 1926, 1926.501(b)(10)
Under IBC 1403.2, what is the minimum water-resistive barrier behind exterior wall siding when no other material is approved?
Answer: One layer of No. 15 asphalt felt meeting ASTM D226 Type 1
1403.2 requires at least one layer of No. 15 asphalt felt complying with ASTM D226 for Type 1 felt, or other approved materials, attached to the studs or sheathing with flashing per 1404.4, forming a continuous WRB behind the veneer. Polyethylene is a Class I vapor retarder (1404.3.3), not a WRB. Two layers are required behind stucco (2510.6), not siding in general.
Reference: 2018 International Building Code, Section 1403.2
Sources
- PSI: Nevada Contractors "C" Classification Candidate Information Bulletin (3/25/2026) (opens in a new tab)
- Nevada State Contractors Board: License examinations (opens in a new tab)
Questions last verified October 23, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.