Louisiana Roofing, Sheet Metal and Siding Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for the LSLBC Roofing, Sheet Metal and Siding classification: 50 questions on steep and low slope roofing, components, repairs and reroofing, safety and estimating. Open book, 70% to pass.

Questions
50
Time limit
2 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Estimating and Plan Reading

A gable roof measures 44 ft by 28 ft on the plan view (horizontal projection, overhangs included). The roof slope is 8:12, which has a pitch (slope) factor of 1.202. How many squares of roof surface does the roof have?

Requirements at a glance

AgencyLouisiana State Licensing Board for Contractors (LSLBC); exams by PSI
Exam50 questions, 2 hours, 70%
Books allowed2018 IBC and IRC, 29 CFR 1926, Atcheson Roofing Construction & Estimating, NRCA Steep Slope and Membrane manuals
RequirementsBusiness and Law course (not an exam), net worth statement, insurance and other LSLBC requirements
Fees$125 to PSI, plus LSLBC application and license fees

Qualifying parties for a Louisiana commercial Roofing, Sheet Metal and Siding contractor license from the LSLBC.

How to get licensed, step by step

  1. Apply to the LSLBC

    Submit an application for licensure, or a request to add a classification or qualifying party to your license. The Board reviews it before you can test.

    LSLBC: apply for a license (opens in a new tab)Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)

  2. Schedule with PSI

    Once approved you get an e-mail from PSI to pay and schedule. Eligibility is good for one year; after that you reapply with the Board.

    Schedule with PSI (Louisiana contractors) (opens in a new tab)

  3. Take the open-book exam

    Bring your own tabbed references. 70% is passing.

    Schedule with PSI (Louisiana contractors) (opens in a new tab)

  4. Finish your license

    Complete the Business and Law course and the remaining LSLBC requirements to be licensed.

    Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)

How to prepare

  • Bring the exact editions on PSI's outline. Louisiana's adopted codes are the 2021 ICC codes and the 2020 NEC, but several PSI exams list other editions (the 2023 NEC, 2018 ICC books). The 2023 NEC and 2024 ICC codes take effect January 1, 2027.
  • Tab your books before exam day. You can highlight, underline and index them with permanent tabs, but you can't write in them, and sticky notes are removed.
  • Steep and low slope roofing including BUR and waterproofing is 18 of 50 questions, and components another 10: know the NRCA manuals' system details.
  • Tab IBC Chapter 15 and IRC Chapter 9 for roof assemblies, underlayment, flashing and fastening.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IBC and the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Building Code (IBC), 2018 Edition
  • International Residential Code (IRC), 2018 Edition
  • 29 CFR Part 1926 (OSHA construction standards)
  • Roofing Construction & Estimating, 1995 (Daniel Atcheson)
  • NRCA Roofing Manual: Steep Slope Roof Systems, 2025
  • NRCA Roofing Manual: Membrane Roofing Systems, 2023

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Estimating and Plan Reading5
Surface Preparation and Planning5
Steep and Low Slope Roofing including BUR and Waterproofing18
Roofing Components10
Safety5
Repairs and Reroofing7

Exam day details

  • Administered by PSI Services for the Louisiana State Licensing Board for Contractors (LSLBC).
  • Fee: $125 to PSI. LSLBC application and license fees are separate.
  • 50 questions in 2 hours; 35 correct (70%) to pass.
  • PSI lists the 2018 IBC and IRC; Louisiana's adopted codes are the 2021 editions. Our questions name the edition they use.
  • Open book: bring your own copies of the allowed references. You may highlight, underline and index them beforehand, but not write in them during the exam. Temporary tabs such as sticky notes are removed.
  • PSI may add unscored experimental questions, which count against your time.
  • The LSLBC must approve your application (or your request to add a classification) first. PSI then e-mails your eligibility, which is good for one year; if you haven't passed by then you reapply with the Board.
  • Business and Law is a required course, not an exam, so there is no separate business exam to take.
  • Code questions are based only on the edition PSI lists. For other references, later editions are fine.

Frequently asked questions

What's on the Louisiana roofing exam?

50 questions: steep and low slope roofing including BUR and waterproofing 18, roofing components 10, repairs and reroofing 7, estimating and plan reading 5, surface preparation and planning 5 and safety 5.

Is it open book?

Yes. You may bring the 2018 IBC and IRC, 29 CFR 1926, the Atcheson estimating book and the two NRCA manuals, tabbed with permanent tabs.

How long is the exam?

2 hours for 50 questions; 35 correct is passing.

Free questions with answers

Show all 10 free questions and answers
  1. A gable roof measures 44 ft by 28 ft on the plan view (horizontal projection, overhangs included). The roof slope is 8:12, which has a pitch (slope) factor of 1.202. How many squares of roof surface does the roof have?

    Answer: 14.81 squares

    Plan area = 44 x 28 = 1,232 sq ft. Sloped area = plan area x pitch factor = 1,232 x 1.202 = 1,480.9 sq ft. One square is 100 sq ft, so 1,480.9 / 100 = 14.81 squares. 12.32 squares ignores the pitch factor, 10.25 divides by the factor instead of multiplying (1,232 / 1.202 / 100), and 18.48 treats the slope as adding 50 percent.

    Reference: General trade practice (roof estimating), Roof area = plan area x pitch factor; 1 square = 100 sq ft

  2. A 28-square asphalt shingle roof has a 3:12 slope. Using the two-layer underlayment method of 2018 IRC R905.1.1 (36-inch sheets, each lapped 19 inches over the one below), about how many 432-sq-ft rolls of felt are needed? Ignore the 19-inch starter strip and end laps.

    Answer: 14 rolls

    A 3:12 slope is between 2:12 and 4:12, so R905.2.2 requires double underlayment, applied per Table R905.1.1(2) with 36-inch sheets lapped 19 inches. Only 36 - 19 = 17 inches of each 36-inch sheet is exposed. Felt = 2,800 sq ft x (36 / 17) = 5,929 sq ft; 5,929 / 432 = 13.7, so 14 rolls. 7 rolls is the single-layer figure (2,800 x 36/34 / 432 = 6.9), 6 rolls ignores laps entirely (2,800 / 432 = 6.5), and 13 rolls simply doubles the plain area (5,600 / 432 = 12.96) without the lap allowance.

    Reference: 2018 International Residential Code, Section R905.2.2 and Table R905.1.1(2)

  3. A crew plans to install concrete tile over spaced 1x4 boards on a new roof. Under 2018 IRC R905.3.1, what deck types may concrete and clay tile be installed over?

    Answer: Solid sheathing or spaced structural sheathing boards

    R905.3.1 permits clay and concrete tile on solid sheathing or on spaced structural sheathing boards, so the spaced deck is acceptable. Solid sheathing is not required, and the code does not tie the deck type to the tile weight.

    Reference: 2018 International Residential Code, Section R905.3.1

  4. A designer specifies wood shakes on a commercial building. Under the 2018 IBC, what is the minimum slope?

    Answer: 4 units vertical in 12 horizontal (4:12)

    IBC 1507.9.2 allows wood shakes only on slopes of 4:12 or greater. Note that the 2018 IRC (R905.8.2) allows shakes at 3:12, so the code named in the question matters. 2-1/2:12 is the tile minimum.

    Reference: 2018 International Building Code, Section 1507.9.2

  5. Slate shingles will be installed on a 6:12 roof. Using the 2018 IBC headlap table, what is the minimum headlap, and how many fasteners secure each slate?

    Answer: 4 inches of headlap; two fasteners per slate

    Table 1507.7.6 gives a 4-inch headlap for slopes from 4:12 up to 8:12, 3 inches from 8:12 up to 20:12 and 2 inches at 20:12 or steeper. Section 1507.7.6 requires two fasteners per slate. 3 inches is the headlap for a steeper roof.

    Reference: 2018 International Building Code, Section 1507.7.6 and Table 1507.7.6

  6. A chimney on a sloped roof measures 36 inches wide perpendicular to the slope. What does the 2018 IBC require on its ridge (upslope) side?

    Answer: A cricket or saddle covered with sheet metal or the roof covering material

    IBC 1503.5 requires a cricket or saddle on the ridge side of any chimney or penetration wider than 30 inches measured perpendicular to the slope; the covering is sheet metal or the same material as the roof covering. Extra flashing layers do not divert water around a wide chimney the way a cricket does.

    Reference: 2018 International Building Code, Section 1503.5

  7. Metal valley flashing is being formed for a clay tile roof on a 5:12 slope under the 2018 IBC. What does Section 1507.3.9 require for the flashing and its underlayment?

    Answer: 11 inches each way from the centerline, a 1-inch splash diverter rib, and 36-inch underlayment under it

    IBC 1507.3.9 requires tile valley flashing to extend at least 11 inches from the centerline each way with a splash diverter rib at least 1 inch high, a 4-inch minimum end lap, and, for slopes of 3:12 and over, a 36-inch-wide underlayment (Type I or self-adhering membrane) the full length of the valley. 8 inches and 3/4 inch are the metal roof shingle values from IRC R905.4.6.

    Reference: 2018 International Building Code, Section 1507.3.9

  8. A crew builds a perimeter guardrail around a low-slope roof before a tear-off. Under 29 CFR 1926.502(b)(1), at what height above the roof surface must the top edge of the top rail be?

    Answer: 42 inches, plus or minus 3 inches

    Section 1926.502(b)(1) requires the top edge height of top rails to be 42 inches plus or minus 3 inches above the walking/working level. The top rail must also withstand at least 200 pounds applied outward or downward.

    Reference: 29 CFR Part 1926 (OSHA construction standards), 29 CFR 1926.502(b)(1)

  9. Under the 2018 IBC, a roof recover is not permitted in which of these situations?

    Answer: Where the existing roof covering is slate, clay, cement or asbestos-cement tile

    IBC 1511.3.1.1 bars a recover where the existing roof is water soaked or deteriorated, where the existing covering is slate, clay, cement or asbestos-cement tile, or where the roof already has two or more applications of any covering. A single sound layer may be recovered if the new covering's instructions allow it.

    Reference: 2018 International Building Code, Section 1511.3.1.1

  10. A house has a water-soaked, deteriorated single layer of shingles. The contractor proposes a new shingle layer over it. Under the 2018 IRC, what applies?

    Answer: A recover is not permitted; the old covering must be removed

    R908.3.1.1 prohibits a recover where the existing roof or covering is water soaked or deteriorated to the point it is not an adequate base for additional roofing. The number of layers does not matter once the base is inadequate.

    Reference: 2018 International Residential Code, Section R908.3.1.1

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.