Requirements at a glance
| Agency | Florida DBPR, Construction Industry Licensing Board (CILB); Professional Testing, Inc. registers and Pearson VUE delivers the exams |
|---|---|
| Experience | About 4 years as a skilled worker or foreman (1 year as foreman); college credit may substitute. Confirm current requirements with DBPR. |
| Exams | Business and Finance plus Roofing trade knowledge (80 questions, 5 hours, 70%) |
| Books allowed | Florida Building Code Building 2023 and HVHZ Testing Application Standards, NRCA manuals, SMACNA Architectural Sheet Metal Manual 7th Edition and Roofing Construction and Estimating |
| Fees | $135 to Professional Testing, Inc., plus a Pearson VUE administration fee per exam ($40 to $80); after you pass, a $40 DBPR application fee and the initial license fee ($200, or $100 in the second year of the cycle). Rule 61G4-12.009 |
Candidates for CILB certification as a roofing contractor, in addition to Business and Finance.
Official links
How to get licensed, step by step
Check the license type
Only certified (statewide) contractors take these exams. Registered contractors are licensed by local jurisdictions.
Florida DBPR: construction examinations (CILB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Apply to the CILB
Submit the application with proof of experience, a credit report or financial-responsibility course, and a background check. Insurance is required for the license.
Florida DBPR: construction examinations (CILB) (opens in a new tab)
Register and schedule
Register with Professional Testing, Inc., then schedule your exam with Pearson VUE. Passing is 70%, and you can review missed items within 21 days. A retake needs a new application.
Professional Testing, Inc. (register for CILB exams) (opens in a new tab)Pearson VUE: Florida construction exams (opens in a new tab)
How to prepare
- The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
- Florida's reference lists change each January. The 2023 Florida Building Code (8th edition) is on the 2026 lists; the 9th edition takes effect December 31, 2026 and several 2027 lists move to 2026 editions.
- Built-up, shingles, single ply and modified bitumen are 15% each. Know the FBC Building chapters on roof assemblies and wind resistance.
- Architectural metal and concrete and clay tile are 10% each; use the SMACNA manual for metal details.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Florida Building Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Florida Building Code, 8th Edition (2023): Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy Conservation, AccessibilityEssential
Approved references on the 2026 lists; the volumes vary by exam. The 9th edition takes effect December 31, 2026.
ICC store (opens in a new tab)Read free (Florida Building Code online) (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- Florida Building Code, Building, 2023 (8th edition)
- Florida Building Code, High-Velocity Hurricane Zone Testing Application Standards (HVHZ), 2023
- NRCA manuals (2020 to 2025 editions)
- SMACNA Architectural Sheet Metal Manual, 7th Edition
- Roofing Construction and Estimating, 13th Printing (2022); Walker's Building Estimator's Reference Book, 33rd Edition; 29 CFR Part 1926
What's on the exam
Official content outline from Professional Testing, Inc. and Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Built-Up | 15 | |
| Shingles and Shakes | 15 | |
| Architectural Metal | 10 | |
| Single Ply | 15 | |
| Modified | 15 | |
| Concrete and Clay Tile | 10 | |
| Membrane Waterproofing | 5 | |
| Drain and Gutters | 5 | |
| Equipment and Safety | 10 |
The outline totals 100; the other items on the 80-question exam are unscored or unassigned.
Exam day details
- Administered by Professional Testing, Inc. and Pearson VUE for the Florida Construction Industry Licensing Board (CILB).
- Fee: $135 to Professional Testing, Inc. when you register, plus $80 to Pearson VUE when you schedule this exam. A retake costs both again. After you pass, DBPR charges a $40 application fee and the initial license fee ($200, or $100 in the second year of the two-year cycle).
- 80 questions in 5 hours; 70% to pass.
- Built-up, shingles, single ply and modified bitumen are 15% each.
- The 2026 reference lists use the 2023 Florida Building Code (8th edition). The 9th edition (2026, based on the 2024 I-codes) takes effect December 31, 2026, and the 2027 lists move several books to 2026 editions, so check the current list for your test date.
- Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
- Questions are equally weighted and a score of 70% is required to pass (not rounded). The printed topic percentages are approximate, plus or minus 3 points. Pretest items are not scored.
- If you fail you may review the items you missed within 21 days. A retake needs a new application.
- Certified contractors are licensed statewide. Registered contractors are licensed locally and do not take these exams.
- Fees are set by Board rule (61G4-12.009) and DBPR's test-administration fee table; confirm the current amounts with Professional Testing, Inc. and DBPR before you apply.
Frequently asked questions
What is on the Florida roofing contractor exam?
Built-up, shingles and shakes, single ply and modified 15% each; architectural metal, concrete and clay tile and equipment and safety 10% each; membrane waterproofing and drains and gutters 5% each.
Does the roofing exam cover high-velocity hurricane zones?
The reference list includes the HVHZ testing application standards of the Florida Building Code, so expect wind-resistance questions.
Free questions with answers
Show all 10 free questions and answers
What is the minimum design slope for drainage that the code requires for a built-up roof (other than coal-tar)?
Answer: One-fourth unit vertical in 12 units horizontal (2 percent)
Section 1507.10.1 sets a minimum design slope of 1/4:12 for built-up roofs. The 1/8:12 figure is tempting but applies only to coal-tar built-up roofs.
Reference: Florida Building Code, Building, 8th Edition (2023), 1507.10.1
A designer proposes a coal-tar built-up roof. What is the lowest design slope Section 1507.10.1 allows for it?
Answer: One-eighth unit vertical in 12 units horizontal (1 percent)
Coal-tar built-up roofs are the exception in 1507.10.1 and may be designed down to 1/8:12. Other built-up roofs need 1/4:12. The code does not permit a dead-level design.
Reference: Florida Building Code, Building, 8th Edition (2023), 1507.10.1
What is the minimum roof slope on which asphalt shingles may be installed under Section 1507.2.2?
Answer: 2 units vertical in 12 units horizontal (2:12)
Section 1507.2.2 permits asphalt shingles only on slopes of 2:12 (17 percent) or greater. Lower slopes need a low-slope membrane system. The Residential code, Section R905.2.2, uses the same 2:12 minimum.
Reference: Florida Building Code, Building, 8th Edition (2023), 1507.2.2
With no fastener recommendation from the manufacturer, which fasteners does Section 1507.4.4 require for a copper roof?
Answer: Copper, brass, bronze, copper alloy or 300 series stainless steel
Section 1507.4.4 pairs fasteners to metals: galvanized for steel roofs; copper, brass, bronze, copper alloy or 300 series stainless for copper roofs; stainless acceptable for all; aluminum only for aluminum roofs on aluminum supports.
Reference: Florida Building Code, Building, 8th Edition (2023), 1507.4.4
Which standard does Section 1507.3.5 require for concrete roof tile, and which for clay tile (Section 1507.3.4)?
Answer: ASTM C1492 for concrete and ASTM C1167 for clay
Concrete roof tile complies with ASTM C1492 and clay roof tile with ASTM C1167. ASTM C406 is the slate standard.
Reference: Florida Building Code, Building, 8th Edition (2023), 1507.3.4 and 1507.3.5
Which statement about loose-laid roofing systems in the High-Velocity Hurricane Zone is correct under Section 1515.1.5?
Answer: No loose-laid ballasted or nonballasted system is permitted
Section 1515.1.5 prohibits loose-laid systems, ballasted or not, in the HVHZ. The ballasted option in Section 1507.12.3 is not available there.
Reference: Florida Building Code, Building, 8th Edition (2023), 1515.1.5
A modified bitumen reroof on an existing building lacks the minimum 1/4:12 design slope, but the roof drains positively. What does Section 1511.1 say?
Answer: Reroofing need not meet the minimum design slope where positive roof drainage exists
The first exception to Section 1511.1 exempts reroofing from the 1/4:12 minimum where the roof provides positive drainage.
Reference: Florida Building Code, Building, 8th Edition (2023), 1511.1, Exception 1
Section 1503.7 requires gutters with downspouts on buildings with eaves of less than what horizontal projection, and requires downspouts to discharge how far from the sidewall?
Answer: Eaves under 6 inches; downspouts discharge at least 1 foot from the sidewall
Section 1503.7 requires condensate lines and downspouts to discharge at least 1 foot from the structure sidewall, and gutters with downspouts on buildings with eaves under 6 inches (except gable rakes and roofs above another roof).
Reference: Florida Building Code, Building, 8th Edition (2023), 1503.7
In the HVHZ, how high must electrical conduit, piping and similar service lines on the roof be raised above the finished roof surface (Section 1522.3.4)?
Answer: Not less than 8 inches
Section 1522.3.4 requires electrical conduit, mechanical piping and other service lines on an HVHZ roof to be raised not less than 8 inches above the finished roof surface. The 14-inch figure is the smallest clearance under raised equipment in Table 1510.10, not a service-line rule.
Reference: Florida Building Code, Building, 8th Edition (2023), 1522.3.4
A sprayed polyurethane foam roof is applied. When must the protective coating go on under Section 1507.14.3?
Answer: Between 2 and 72 hours after the foam
Section 1507.14.3 requires the protective coating (acrylic ASTM D6083, silicone D6694 or moisture-cured polyurethane D6947) no less than 2 nor more than 72 hours after foam application.
Reference: Florida Building Code, Building, 8th Edition (2023), 1507.14.3
Sources
- Florida DBPR: construction examinations (CILB) (opens in a new tab)
- Professional Testing, Inc. (Florida construction exam registration) (opens in a new tab)
- Pearson VUE: Florida construction exams (opens in a new tab)
- Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.