Requirements at a glance
| Agency | California Contractors State License Board (CSLB); exams by PSI |
|---|---|
| Experience | 4 years of journey-level experience in the trade within the last 10 years |
| Exams | C-27 Landscaping trade exam, plus the Law and Business exam |
| Format | Closed book, 4-choice, 3.5 hours per exam; question count and pass score not published |
| Study references | 2025 California Building and Plumbing Codes; MWELO; Sunset Western Garden Book; Irrigation Association, Principles of Irrigation |
| Fees | $450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints |
Qualifiers for a California C-27 Landscaping contractor license. Taken together with the Law and Business exam.
Official links
How to get licensed, step by step
Pick your classification
Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.
Apply to CSLB
Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.
California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)
Schedule Law and Business and the C-27 exam with PSI
Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.
PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)
Bond, fees and fingerprints
After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.
How to prepare
- The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
- Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
- Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
- Hardscape installation and the drainage, irrigation, lighting and plant installation section are each about 21%.
- Review the Model Water Efficient Landscape Ordinance and irrigation design basics: pressure, flow, zones and controllers.
- Know USA/811 notice before digging and basic retaining wall, paving and grading practice.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
CSLB examination study guide for your classificationEssential
Free from CSLB. Lists the sections, approximate weights and references for the exam.
2025 California Building, Electrical, Plumbing and Mechanical Codes
Not allowed in the exam room. CSLB's study guides cite the 2025 California codes (effective January 1, 2026).
Official reference list (as published by the testing agency)
- CSLB C-27 Landscaping study guide (applies to exams on or after July 1, 2026)
- 2025 California Building Code and Plumbing Code
- Model Water Efficient Landscape Ordinance (MWELO, Department of Water Resources)
- Sunset Western Garden Book; Irrigation Association, Principles of Irrigation; ISA Arborist Study Guide; Sauter, Landscape Construction
- Cal/OSHA Title 8 safety orders (2025)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Planning and Estimating | 18 | |
| Construction Preparation | 12 | |
| Hardscape Installation | 21 | |
| Drainage, Irrigation, Lighting, and Plant Installation | 21 | |
| Maintenance and Repair | 11 | |
| Safety | 17 |
Exam day details
- Administered by PSI Services for the California Contractors State License Board (CSLB).
- Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
- Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
- You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
- Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
- The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
- Work worth $500 or more (labor and materials) requires a California contractor license.
Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.
Frequently asked questions
What's on the California C-27 exam?
CSLB lists approximate weights: hardscape installation 21%, drainage, irrigation, lighting and plant installation 21%, planning and estimating 18%, safety 17%, construction preparation 12% and maintenance and repair 11%.
Does the C-27 exam cover water-efficient landscaping?
The study guide names the Model Water Efficient Landscape Ordinance, so expect irrigation design and water-efficiency questions.
How many questions are on the exam and what score do I need?
CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.
Free questions with answers
Show all 10 free questions and answers
A front lawn measures 50 ft by 70 ft. It contains a 12 ft by 25 ft planting bed and a 4 ft by 40 ft walkway that will not be sodded. Sod comes on pallets that each cover 450 sq ft. Ignoring any waste allowance, how many pallets must be ordered?
Answer: 7 pallets
Net sod area = 3,500 - 300 (bed) - 160 (walk) = 3,040 sq ft. Dividing, 3,040 / 450 = 6.76, and a partial pallet cannot be bought, so round up to 7. Six pallets would be short; 8 comes from forgetting the bed and walkway (3,500 / 450 = 7.8), and 9 from adding 10 percent waste to that gross area.
Reference: General trade practice, General trade practice: sod area takeoff
While designing a retaining wall, which of the following is NOT one of the stability conditions the California Building Code lists for retaining wall design?
Answer: Frost heave of the wall face
CBC 1807.2.1 says retaining walls shall be designed to ensure stability against overturning, sliding, excessive foundation pressure and water uplift. Frost heave of the wall face is not in that list, so it is the choice that is not named. Water uplift is the item most often forgotten when drainage behind the wall is not planned.
Reference: 2025 California Building Code, 1807.2.1
Under Cal/OSHA Section 1541(b), which condition must be met before a landscape crew begins excavating for a new irrigation mainline?
Answer: Area marked per 4216.2 and positive responses received from operators
Section 1541(b)(1)(A) says excavation shall not commence until the area has been marked as specified in Government Code 4216.2 and the excavator has received a positive response from all known owners or operators of subsurface installations within the project boundaries. A visual guess, a test hole or a homeowner statement does not replace that response.
Reference: Cal/OSHA Title 8, California Code of Regulations, 1541(b)(1)(A)
A crew saw-cuts contraction joints in hardened concrete for a sidewalk built to the Caltrans Standard Specifications. What is the minimum depth of each saw cut?
Answer: 1 inch
Caltrans 2026 Standard Specifications 73-1.03A forms contraction joints either by scoring with a grooving tool or by saw cutting hardened concrete to a depth of at least 1 inch, with curing compound applied to the cut faces right away. That matches the common one-quarter-of-thickness rule for a 4-inch walk (4 x 1/4 = 1 inch). A 1/2-inch cut is too shallow to make the crack form at the joint, and 2 or 3 inches cuts half the slab or more.
Reference: Caltrans 2026 Standard Specifications, 73-1.03A
Under the Caltrans Standard Specifications for concrete sidewalks and driveways, how long must the forms stay in place after surface finishing?
Answer: At least 12 hours
Caltrans 2026 Standard Specifications 73-3.03 requires forms for sidewalks, gutter depressions, island paving, curb ramps and driveways to stay in place for at least 12 hours after surface finishing. Stripping after an hour can break the green edges. Seven days is the water-curing period in 90-1.03B(2), and 28 days is the usual strength-test age, not a form time.
Reference: Caltrans 2026 Standard Specifications, 73-3.03
A reduced-pressure principle assembly is being mounted for an irrigation supply. Under CPC 603.4.3, what is the minimum clearance between the lowest part of the assembly and the grade?
Answer: 12 inches
CPC 603.4.3 requires access and clearance for testing and repair per the manufacturer's instructions and not less than 12 inches between the lowest portion of the assembly and grade, floor or platform. Assemblies elevated more than 5 feet above grade need a platform capable of supporting a tester.
Reference: 2025 California Plumbing Code, 603.4.3
Under the Caltrans Standard Specifications, what is done with irrigation control conductors at each change of direction greater than 45 degrees in an open trench?
Answer: Tie a 24-inch loop, untied after connections
Caltrans 2026 Standard Specifications 20-2.04C(2) requires a 24-inch loop of wire at all changes of direction greater than 45 degrees, untied after all connections are made, so the wire has slack for settlement and future repair. The same section wraps the conductors together with tape at 10-foot intervals, keeps control and neutral conductors from lying on top of each other and lays them at supply-line depth (or at least 12 inches elsewhere). Extra splices or boxes at bends add failure points the spec does not call for.
Reference: Caltrans 2026 Standard Specifications, 20-2.04C(2)
What must be prepared before cutting any standing tree or trunk, under Section 3427(c)(2)?
Answer: A planned escape route for all workers
Section 3427(c)(2) requires a planned escape route for all workers to be prepared before cutting any standing tree or trunk. The work area must also be cleared (3427(c)(1)), and an audible warning must be given just before the tree falls (3427(c)(4)).
Reference: Cal/OSHA Title 8, California Code of Regulations, 3427(c)(2)
A landscape crew is working outdoors where the temperature is 84 degrees F. Under Section 3395(d)(1), what must the employer have in place?
Answer: Shade for all employees on rest periods
Section 3395(d)(1) requires shade to be present when the temperature exceeds 80 degrees F, with enough shade for the employees on recovery or rest periods to sit in a normal posture fully in the shade. Shade must also be available at lower temperatures (3395(d)(2)), and the 95-degree threshold triggers added high-heat procedures.
Reference: Cal/OSHA Title 8, California Code of Regulations, 3395(d)(1)
A tree worker without line clearance qualification must trim a tree near a high voltage power line. Under Section 3423(b)(1), how close may the employee work to energized high voltage lines?
Answer: Not within 10 feet of the lines
Section 3423(b)(1) prohibits tree trimming within 10 feet of high voltage energized power lines unless the employee meets subsection (c), which sends line clearance work on conductors over 600 volts to the High-Voltage Electrical Safety Orders. Rubber gloves do not make closer work acceptable for an employee without that qualification. The 1-foot figure applies only to qualified workers near low voltage lines (3423(b)(2)).
Reference: Cal/OSHA Title 8, California Code of Regulations, 3423(b)(1)
Sources
- CSLB: Examination study guides (content outlines) (opens in a new tab)
- CSLB: Examination FAQ (opens in a new tab)
- CSLB: List of all fees (opens in a new tab)
- CSLB: Get Licensed to Build (PDF) (opens in a new tab)
Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.